Second Year Deliverables

The present deliverables have been written according to fixed guidelines. Each of them was under the coordination of one partner, with the participation of various other partners:

Deliverable Coordinator Involved Partners
0.1.2 Inria-Spectre All
0.2.2 Inria-Spectre All
2.2 GMD GMD, Inria (all)
3.1.2 Inria-Meije Inria (all)
3.2.2 Prover Technology Prover Technology
3.3.2 Inria-Spectre Inria-Spectre
3.4.2 Inria-Spectre Inria-Spectre
3.5.2 Inria-Spectre Inria-Spectre
4/5.1.2 Inria-EpAtr Inria-EpAtr
4/5.2.2 Inria-EpAtr Inria-EpAtr
4/5.3.2 Inria-EpAtr Inria-EpAtr
4/5.4.2 Inria-Meije Inria-Meije
6.1.2 Inria-EpAtr Inria-EpAtr, Inria-Meije
6.2.2 Inria-EpAtr Inria-EpAtr
7.2 Linkoping Linkoping

Notice that, during this year, Logikkonsult changed its name into "Prover Technology".