Go backward to Meetings
Go up to Top
Go forward to First Year Deliverables
Case Studies
No deliverable on case studies was provided for in the Project
Programme. However, since a great part of this first year work was
devoted to the definition, understanding, and specification of case
studies, this work is reported here. The considered case studies are the
following:
- Schneider-Electric proposed a "Source Range Instrumentation
System" for a nuclear power plant. They provided a textual description
together with the corresponding program in Lustre.
- SAAB-MA proposed an "Environmental Air Control System",
together with a very simplified "toy" version of the same example.
The "toy" version was mainly considered this year, because the
description, given in ASA, must be translated by hand into our
languages.
- EDF proposed a controller of a steam generator. The example is
described in a document, the formal part of which consists in functional
diagrams.
This page has been automatically generated using
Hyperlatex.