Prev Up Next
Go backward to Case Studies
Go up to Top
Go forward to Proposed Changes in the Programme or Schedule

First Year Deliverables

The present deliverables have been written according to fixed guidelines. Each of them was under the coordination of one partner, with the participation of various other partners:

Deliverable Coordinator Involved Partners
0.1.1 Inria-Spectre All
0.2.1 Inria-Spectre All
2.1 GMD GMD, Inria-Spectre, Inria-Meije
3.1.1 Inria-Meije Inria-Meije, Inria-EpAtr
3.2.1 Logikkonsult Logikkonsult, Inria-Spectre
3.3.1 Inria-Spectre Inria-Spectre
3.4.1 Inria-Spectre Inria-Spectre
3.5.1 Inria-Spectre Inria-Spectre
4.1 Inria-EpAtr Inria-EpAtr
5.1.1 Inria-Meije Inria-Meije
5.2.1 Inria-EpAtr Inria-EpAtr
6.1.1 Inria-EpAtr Inria-EpAtr
6.2.1 Inria-EpAtr Inria-EpAtr
7.1 Linkoping Linkoping,Inria-Spectre

This page has been automatically generated using Hyperlatex.

Prev Up Next